ContainerSignal

What is a General Rate Increase (GRI)? How rate notices work

By ContainerSignal Editorial · · 7 min read

A general rate increase (GRI) is an announced increase in a carrier’s published ocean tariff on a named trade lane, expressed as an amount per container, with an effective date and a rule for which cargo it catches. It is not a surcharge and it is not a quote. It is a change to the base ocean freight number a carrier publishes, and everything that matters commercially is in the wording of the notice.

What the notice actually fixes

Hapag-Lloyd’s increase from the Indian Subcontinent, Pakistan and the Middle East to the United States and Canada, reported on 5 October 2026, is a clean example (Container News). The carrier set a General Rate Increase and General Rate Adjustment of US$1,000 per container to the East Coast and Gulf Coast, with the West Coast adjustment US$500 per container higher. It covered 20ft and 40ft dry, reefer and special containers, including high cube equipment, for containers gated in full from 1 November 2026.

Two details matter. The unit is per container, not per TEU, so a 20ft box pays the same US$1,000 as a 40ft box: measured per TEU, the small box carries twice the increase of the large one. The trigger is a gate-in date, not a sailing date or a booking date.

Base rate, tariff level, charge line

Carriers publish rate changes under several names, and the names do not sort cleanly. A GRI moves the ocean freight rate. A FAK (“freight all kinds”) increase replaces the published tariff level itself. A surcharge sits beside the base rate as its own charge line. Hapag-Lloyd’s 1 December 2026 FAK levels from the Far East are quoted per box size: US$3,000 per 20ft and US$4,500 per 40ft dry or high cube to Northern Europe, and US$5,100 and US$6,400 to the Western Mediterranean and Adriatic (Container News). The levels include Marine Fuel Recovery and remain subject to surcharges, and no percentage change was published.

A peak season surcharge (PSS) is the other shape. Hapag-Lloyd’s notice reported on 17 November 2026 sets US$500 per TEU from the Far East to North Europe and US$750 per TEU to the Mediterranean from a tariffing date of 1 December 2026, and US$400 per TEU from Asia and Oceania to Dar es Salaam for cargo loaded on board from 22 November 2026 (Container News). It sits on top of the ocean rate.

InstrumentQuoted inRecent exampleWhat it changes
GRI or GRAPer containerUS$1,000 per container, Indian Subcontinent to US East and Gulf CoastsThe ocean freight rate in the tariff
FAK tariff levelPer 20ft or 40ftUS$4,500 per 40ft, Far East to North EuropeThe published tariff rate for the lane
PSSPer TEUUS$500 per TEU, Far East to North EuropeA separate surcharge line on top

Three clocks

An effective date is not one date. Hapag-Lloyd’s North America increase runs from the gate-in date, its Far East to Europe FAK levels from the tariffing date, its Dar es Salaam surcharge from loading on board. CMA CGM’s US$1,000 per container increase from Asia to Latin America applies by cargo loading date (Container News).

A container that gates in on 30 November under a 1 December rule escapes the increase; one that gates in on 2 December does not, whatever the booking date.

Scope matters as much. The CMA CGM notice covers all Asian ports and applies to dry containers, refrigerated cargo, out-of-gauge shipments and paying empty containers, as a single amount per container rather than a charge scaled by TEU.

Why notices arrive weeks early

In the United States the timing is statutory. Carriers must keep tariffs open to public inspection in an automated tariff system, and a new rate, or a change that raises a shipper’s cost, may not take effect earlier than 30 days after publication, unless the Federal Maritime Commission allows it sooner for good cause. A decrease may take effect on publication (46 U.S.C. § 40501).

That rule explains the rhythm of the market: increases are announced on a calendar, weeks ahead, and are visible to anyone reading the carrier’s advisories. It governs the US trades. Other jurisdictions set their own notice periods.

Why the announced number is not the price

Two things sit between a GRI and an invoice. The first is that a published tariff is not a transaction price. MSC said so in its December notice: the figures represent published tariffs for the period “rather than confirmed transaction rates paid by shippers” (Container News). Shippers with volume or a competing service negotiate from the tariff, not at it.

The second is the market the notice lands in. Drewry’s World Container Index fell 2% to US$4,305 per 40ft container in its 12 November assessment, while the Freightos Baltic Index rose 1% to US$3,485, as reported by Container News (index report). Into that market, carriers published 1 December increases on Asia to Europe and Asia to Latin America. Announced and realised are different numbers, and the gap is where most of the commercial argument happens. Capacity drives it: when space is easy to find, a published increase is often absorbed, discounted at booking or rolled forward, which is why blank sailings and capacity management matter more than the headline amount.

What the GRI does not cover

Surcharges keep running. MSC’s December 2026 notice for the Far East to the Mediterranean and Black Sea lists a Global Fuel Surcharge of US$304 per TEU for December against US$266 in November, an Emission Control Area surcharge of US$15 per TEU for Mediterranean and specified Northern European destinations or US$52 for other Nordic and Baltic ones, a Carbon Limitation Surcharge of US$20 per TEU and a Carbon Review Surcharge of US$90 per TEU for Northern Europe and US$133 for the Mediterranean. Rates run from base port to base port, out-port moves carry extra origin and destination charges, terminal handling may be added, and IMO-classified and high-value cargo are excluded.

Compare total landed cost, not the GRI headline. Those charge lines are quoted per TEU and apply to every container, so they add up quickly against a per-container increase.

Reading the next notice

  • The unit: per container, per 20ft and 40ft, or per TEU.
  • The trigger: gate-in, tariffing, loading or sailing date.
  • The scope: origins, destinations, equipment types.
  • Whether it replaces the tariff rate or adds a line beside it.
  • The exclusions: IMO cargo, high-value cargo, out-of-gauge, empties.
  • The duration: “until further notice” is not a commitment, and some notices carry an end date.
  • The arithmetic: a flat per-container amount hits a 20ft harder than a 40ft.

What to watch

The 1 December 2026 tranche is the near-term test. Carriers published higher levels while the composite indexes were falling, so the checkable question is whether those levels hold at booking or get discounted within weeks. For how the indexes are built, see the guide to container freight rate indexes, and for market context, the update for the week to 12 November.

Frequently asked questions

Is a general rate increase the same thing as a surcharge?
No. A GRI changes the ocean freight rate in the carrier's published tariff. A surcharge such as a peak season surcharge or a bunker charge is a separate line added on top of that rate, quoted in its own unit and with its own effective date.
Does a GRI apply to cargo moving under a contract?
A GRI changes the published tariff. Cargo moving under a service contract is priced by that contract for its term, so an announced GRI bites hardest on spot and tariff bookings, and on contracts when they come up for renewal.
How much notice must a carrier give before a rate increase?
In the United States, a new rate or an increase that raises a shipper's cost may not take effect earlier than 30 days after publication, unless the Federal Maritime Commission allows it sooner for good cause. Notice periods elsewhere differ by jurisdiction.

Related reading